Three spans of hollow bridge planks rated for Vic roads T44 capacity, 3.6 meters wide.
The bridge planks were landed on piers with structural steel, three planks side by side.
The outside or edge planks were manufactured with upstands to eliminate the need for edge form for the pouring of structural screed.
Two cranes were engaged, one at each bank to install the planks to achieve the reach required.
The bridge planks were installed in one day. Reinforcing and topping screed was placed on one consecutive day.